Posted on by phuongtranhn


So I am now taking hand-over for another project, Nhat Tan monitoring project. Nothing much so far. Just an 1.5 Million dolar project and I stept in the middle of everything. Still have to work with them the Japanese.

WP_20130510_002

Posted on by phuongtranhn | Posted in Phuong as an engineer at VSL


Leave a Reply

Your email address will not be published. Required fields are marked *